Entering content frame

Procedure documentation Integrating Activities Locate the document in its SAP Library structure

Prerequisites

To integrate the contents of an activity of a workspace A into a workspace B, use the command line client. The DTR eclipse client does not provide an option to carry out the process of integration.

Procedure

To integrate the activity use the following command on the DTR command line client:

Integrate –a <activity> -w <source workspace> <target workspace>

For more information on the DTR command line client, refer to the DTR command line client usage guide.

Result

The chosen activity is integrated into the target workspace. The workspace refers the versions contained in that activity.

 

 

 

 

Leaving content frame